Tasks that will get done and not get done prior to the Bash.

Skip to: New Posts  Last Post
Posted by boss347convertible
9/16/2024 12:32 PM
#1

With the Bash rapidly approaching, I will not complete some tasks:
1. Install new fuel lines;
2. Install new fuel pump;
3. Replace A arm bushing;
4. Stone guard installation;
5. Paint front apron;
6. Repair power steering leak;
7. Install new tires;
8. Clear coat rims;
9. Replace convertible rear window;
10. Replace corroded components;
11. Install a spare tire;
12. Wax and polish;
13. Apply touch up paint;
14. Purchase new floor mats; 
15. Install new carburetor; and
16. Install Auto Cool Guy thermostat.


Tasks I will complete:
1. Check all fluids;
2. Check all undercarriage fasteners;
3. Check all engine compartment fasteners;
4. Torque lug nuts;
5. Clean trunk; 
6. Bring extra power steering fluid and engine oil;
7. Bring extra fuel pump;
8. Check tire pressure;
9. Bring tools; and
10. Apply race tape. 

Looking forward to meeting all of you and putting a face these posts that I read.

 
Posted by Mochaman
9/16/2024 3:11 PM
#2

How far are you traveling?
 

 
Posted by Bullet Bob
9/16/2024 3:55 PM
#3

Heck Ed, he's a SoCal guy so he'll prolly have to drive at least 50 miles.  Not to worry though, I think he has a very reliable Model T to bring if the Mustang won't make it.
Looking forward to meeting you, "Boss347".
 


"you get what you pay for, good work isn't cheap, and there are NO free lunches...PERIOD!"
 
Posted by boss347convertible
9/16/2024 4:07 PM
#4

My round trip should be 515 miles. I am going to San Luis Obispo after the Bash. The Model T made it to and through Death Valley (670 miles), and the Mustang has survived more than a few trips over 500 miles, so with a tailwind and some luck, I will see you all at the Bash.
Looking forward to meeting all of you.

 


 
Main page
Login
Desktop format